Adhesive plaster

Top installed railing, adhesive plaster

Top installed frame and 160mm handrail with vertical bracket

Positioning full height support DET.15

Recommended dewatering method with side installed railing is inside dewatering

With side installed frame the minimum overhang of pieliseinä is 50mm, recommended 80mm

Vertical handrail bracket installed to a concrete pillar DET.17

Depthwise adjustment range of full height support +-5mm

Handrail wall brackets' adjustment range is +-10mm vertically and +-25mm in depth

Top installed frame and 160mm handrail with vertical bracket, 90° railing
Positioning full height support DET.16

In 90° railings, wall brackets also sustain pull, so a wider full height support and 150x50x5 wall attachment profile is needed. DET16

Recommended dewatering method with side installed railing is inside dewatering

With side installed frame the minimum overhang of edge wall is 50mm, recommended 80mm

Corner must be supported to the building frame with a pull anchor DET. 16

Depthwise adjustment range of full height support +-5mm

Handrail wall brackets' adjustment range is +-10mm vertically and +-25mm in depth

Top installed frame and 160mm handrail with vertical bracket

Positioning full height support DET.16

Recommended dewatering method with side installed railing is inside dewatering

With side installed frame the minimum overhang of pieliseinä is 50mm, recommended 80mm

Pillar distance is a constant between 180-220mm DET.18

Depthwise adjustment range of full height support +-5mm

Handrail wall brackets' adjustment range is +-10mm vertically and +-25mm in depth

Top installed frame and 160mm handrail with vertical bracket

Wall attachment to a full height support

Details

Side installed frame, adhesive plaster

Side installed frame and 160mm handrail with vertical bracket

Positioning full height support DET.15

Recommended dewatering method with side installed railing is inside dewatering

With side installed frame the minimum overhang of pieliseinä is 50mm, recommended 80mm

Vertical handrail bracket installed to a concrete pillar DET.17

Depthwise adjustment range of full height support +-5mm

Handrail wall brackets' adjustment range is +-10mm vertically and +-25mm in depth

Side installed frame and 160mm handrail with vertical bracket, 90° railing

Positioning full height support DET.16

In 90° railings, wall brackets also sustain pull, so a wider full height support and 150x50x5 wall attachment profile is needed. DET16

Recommended dewatering method with side installed railing is inside dewatering

With side installed frame the minimum overhang of pieliseinä is 50mm, recommended 80mm

Corner must be supported to the building frame with a pull anchor DET. 16

Corner must be supported to the building frame with a pull anchor DET. 16

Depthwise adjustment range of full height support +-5mm

Handrail wall brackets' adjustment range is +-10mm vertically and +-25mm in depth

Side installed frame and 160mm handrail with vertical bracket

Installing horizontal bracket to a brick wall DET. 19 Brickwork is to be supported with extra iron fittings according to structural designer: in brick seams at corners, a 7mm rustproof rebar pair around the corner, reaching two brick lengths to both directions. Extra brick facade screws to seams at installation point.

Dewatering with a system inside the slab

Vertical bracket installed to a concrete pillar with side installed frame DET.20

Handrail wall brackets' adjustment range is +-10mm vertically and +-25mm in depth

Side installed frame and 160mm handrail with vertical bracket

Installing horizontal bracket to a brick wall DET. 19 Brickwork is to be supported with extra iron fittings according to structural designer: in brick seams at corners, a 7mm rustproof rebar pair around the corner, reaching two brick lengths to both directions. Extra brick facade screws to seams at installation point.

.