Partition walls

Horizontal wall bracket in partition wall, 220mm handrail
Attachment type of the lower frame (side or top installed frame) affects the slab edge.

When installed on top of the slab the minimum overhang of partition wall exceeding the slab is 32mm, recommended 50mm.

When side installed, the minimum overhang of partition wall exceeding the slab is 35mm, recommended 80mm.

Vertical wall bracket in partition wall, 220mm handrail
Attachment type of the lower frame (side or top installed frame) affects the slab edge.

When installed on top of the slab the minimum overhang of partition wall exceeding the slab is 32mm, recommended 50mm.

When side installed, the minimum overhang of partition wall exceeding the slab is 35mm, recommended 80mm.

Horizontal wall bracket in partition wall, 220mm handrail

Both the railing and the glazing can be continued over partition walls by hollowing out the handrail. In this situation it is advisable to use seal flashings between the element blocks.

Attachment type of the lower frame (side or top installed frame) affects the slab edge.

Vertical wall bracket in partition wall, 220mm handrail

Parcol wool panel fire partition wall

If the wall structure does not withstand the required load, the attachment can be done with a full height support, installed to the ceiling and balcony floor. Attachment type of the lower frame (side or top installed frame) affects the slab edge.